MEP ENGINEERING

Permits and approvals

This page covers the bureaucratic part: what has to be approved, by whom, in what order, and what we need from you. Durations and fees appear here only once confirmed — we do not invent numbers.

MEP ENGINEERING
01 — CHECKLIST

Work that requires design and approval

01

New construction and reconstruction under a building permit

02

Increase of allocated electrical capacity or a new connection

03

Gas connection and boiler room installation

04

Water and sewer connection or an increase in demand

05

Installation and upgrade of fire protection systems

06

Change of use: apartment → office, office → medical room, retail → restaurant

07

Layout changes that relocate wet zones or shafts

08

Equipment on the façade: condensers, extracts, kitchen ductwork

02 — PROCESS STAGES

Process stages

Each stage ends with a specific document, not a status.

01

Collect baseline data

Public registry extract, existing technical conditions, architectural plans, building function and operating profile.

02

Preliminary load calculations

Electricity in kW, water in m³/day, heat in kW. These figures go into the utility applications.

03

Applications for technical conditions

Filed in parallel with electricity, water and gas companies so waiting periods do not stack up.

04

Architectural approval

The urban development service in Tbilisi or the relevant municipal service in the regions.

05

Fire section

Review of suppression, detection and smoke control together with the evacuation scenario.

06

Closing comments

We amend the documentation and resubmit. The log shows which comment was closed and when.

07

Installation and supervision

Hidden-works records, material certificates, change tracking for the as-builts.

08

Testing and handover

Balancing and test records, the final documentation set and acceptance by the commission.

03 — DOCUMENTS

What we need from you

Title document or lease agreement

Public registry extract and site plan

Architectural plans in dwg or pdf

Existing technical conditions if the building is already connected

Process brief: equipment, kitchen layout, medical devices

Power of attorney for filing applications

04 — AUTHORITIES

Authorities and requirements

The table is a reference. Durations and fees depend on the building and are filled in at project start.

Urban development service (Tbilisi) / municipality

What is approved

Building permit stages, façade interventions

What we need from you

Title, registry extract, architectural set

Technical and Construction Supervision Agency

What is approved

Supervision of construction activity, handover into operation

What we need from you

Records of completed works

Telasi (Tbilisi)

What is approved

Technical conditions for connection or capacity increase

What we need from you

Load schedule, title, application

Energo-Pro Georgia (regions)

What is approved

Connection and allocated capacity outside Tbilisi

What we need from you

Same package for the site address

Georgian Water and Power (Tbilisi)

What is approved

Water and sewer connection, demand increase

What we need from you

Water demand calculation, plans

United Water Supply Company of Georgia

What is approved

Water and sewerage in the regions

What we need from you

Same package

Tbilisi Energy / SOCAR Georgia Gas

What is approved

Gas connection, boiler room

What we need from you

Gas demand calculation, boiler room layout

Emergency Management Service (MIA)

What is approved

Fire section and evacuation scenario

What we need from you

Building function, occupancy, plans

05 — FAQPermitting questions

Can allocated capacity be increased on an operating building?

Yes, by application to the utility. We recalculate the balance first — if the peak can be reduced, an increase is often unnecessary.

Is a design required for a layout change that moves wet zones?

Yes. Drainage falls and waterproofing change, and that is a liability question towards neighbours.

Who is responsible for fire certification?

The designer for the design solution, the installer for workmanship, the owner for operation. All three links are documented.

How long does permitting take?

It depends on the authority and completeness of the documentation.

Can construction start before technical conditions?

It happens, but it is risky: a capacity or demand limit can change the entire scheme.

Do you handle correspondence on our behalf?

Yes, under power of attorney. Decisions and signatures stay with the client.

What if an authority issues a comment?

We amend and resubmit at our cost when the comment concerns our scope.

Do you work outside Tbilisi?

Yes. In the regions the utility companies and municipal service change — we account for that in the programme.

Building stuck at approvals?

Send the documents you have — we will say what is missing and in what order to proceed.

Contact →