Fire protection and detection

Suppression, detection, smoke control and evacuation logic.

The design is built around the evacuation scenario: automation shuts down ventilation, releases doors and starts smoke control under one logic.

MEP ENGINEERING
01 — SCOPE
Scope

Sprinkler and hydrant systems following NFPA 13 / EN 12845

Fire pump room and water storage to NFPA 20

Fire detection and alarm following NFPA 72 logic

Smoke extract and stair pressurisation

Gas suppression for server rooms and archives

Interlocks with HVAC, lifts and access control

Deliverables

Hydraulic calculations for suppression

Device and detector layouts

Cause-and-effect matrix in text and table form

Equipment schedule

Submission album

Test programme for handover

Building types

Shopping centres

Hotels

Warehouses

Data centres

Business centres

Standards

NFPA 13

NFPA 20

NFPA 72

EN 12845

Typical problems we solve
01

The design kept failing review

We check scenarios and interlocks — the comment is usually in the automation logic, not the equipment.

02

Exposed ceilings and sprinkler layout

We agree routes with the designer first, ceiling pattern second.

03

Server room and water

We design gas suppression in the server room and remove sprinklers from that zone.

FAQ

Who inspects the system before handover?

The design is reviewed by the relevant service, the installation through test records.

How often is servicing required?

Per regulation and manufacturer requirements; the schedule goes into the operating manual.

Can it be delivered in phases?

Technically yes, if the mains are installed in the first phase.

02 — PROCESS

Process

01

Survey and brief

We measure what exists: available capacity, pipe sizes, slab-to-ceiling heights, routing of services. We write the brief, the client approves it.

02

Concept and load calculations

Heating and cooling loads to EN 12831, electrical balance, water demand. This is where the kW and m³/h you will request from utilities are fixed.

03

Schematic design

Equipment layout, plant room areas, main shafts and routes. Agreed with the architect before the façade and ceilings close.

04

Detailed design

Plans, schematics, details, specifications and bills of quantities. Clashes are resolved in the model — pipe and duct meet on screen, not on site.

05

Technical conditions and approvals

Applications to utility companies, fire section review, closing of comments. We keep a log of what was submitted and when.

06

Tender and suppliers

We issue a procurement sheet with technical parameters and compare offers on service and spare-part availability, not price alone.

07

Site supervision

Scheduled visits, hidden-works records, change tracking. An installation error is corrected while the ceiling is still open.

08

Commissioning and handover

Air and water balancing against design, interlock testing, as-built documentation and an operating manual for the facility team.