Energy audit and efficiency

Measurement, thermography, a measures list with payback periods.

We measure first and propose second. Every measure in the report carries a cost and an effect.

MEP ENGINEERING
01 — SCOPE
Scope

Energy consumption collection and analysis following EN 16247

Thermography and air-tightness assessment

Building model and energy balance

Prioritised measures list with costs

Payback calculations against tariffs

Monitoring plan for verified results

Deliverables

Audit report with measurements

Annotated thermograms

Measures table with expected effect

Payback calculation

Brief for the retrofit

Monitoring indicators

Building types

Hotels

Business centres

Production

Housing stock

Retail

Standards

EN 16247

ISO 50001

EN ISO 52016

Typical problems we solve
01

Bills grow, the cause is unknown

We add zone metering and find where consumption goes.

02

Will the investment pay back

We model scenarios and show which measure returns first.

03

The building is old

We start with what does not touch the façade: controls, schedules, hydraulics.

FAQ

How long does an audit take?

It depends on the measurement period.

Is a building model needed?

For large buildings, yes — it allows scenarios to be compared.

Does it help with certification?

Yes, the report supports the preparatory stage of green certification.

02 — PROCESS

Process

01

Survey and brief

We measure what exists: available capacity, pipe sizes, slab-to-ceiling heights, routing of services. We write the brief, the client approves it.

02

Concept and load calculations

Heating and cooling loads to EN 12831, electrical balance, water demand. This is where the kW and m³/h you will request from utilities are fixed.

03

Schematic design

Equipment layout, plant room areas, main shafts and routes. Agreed with the architect before the façade and ceilings close.

04

Detailed design

Plans, schematics, details, specifications and bills of quantities. Clashes are resolved in the model — pipe and duct meet on screen, not on site.

05

Technical conditions and approvals

Applications to utility companies, fire section review, closing of comments. We keep a log of what was submitted and when.

06

Tender and suppliers

We issue a procurement sheet with technical parameters and compare offers on service and spare-part availability, not price alone.

07

Site supervision

Scheduled visits, hidden-works records, change tracking. An installation error is corrected while the ceiling is still open.

08

Commissioning and handover

Air and water balancing against design, interlock testing, as-built documentation and an operating manual for the facility team.