SERVICE

Site supervision, commissioning, service

Site visits, hidden works, balancing, as-builts and service.

A design earns its value when the building is built the way it was drawn. We verify that on a schedule.

MEP ENGINEERING
01 — SCOPE
Scope

Visit schedule and supervision log

Review of hidden-works records

Review of contractor shop drawings

Air and water balancing to EN 12599 / EN 14336

Interlock and cause-and-effect testing

As-built documentation and operating manual

Deliverables

Supervision log

Snag list with statuses

Balancing records

Test records

As-built album

Operating manual

Building types

Any building type

Hotels

Clinics

Residential

Production

Standards

EN 12599

EN 14336

BSRIA BG 1

Typical problems we solve
01

The installer changes the solution unilaterally

A change is valid only in writing — that is what preserves liability.

02

The system runs, but not at design duty

We balance it and record the actual flows in a protocol.

03

Documents are missing at handover

The list is assembled back at detailed design stage.

FAQ

How often do you visit site?

On schedule and at critical milestones. Frequency is fixed in the contract.

Will you supervise someone else’s design?

Yes, after a documentation audit.

Is there service after handover?

Yes, scheduled and on call.

02 — PROCESS

Process

01

Survey and brief

We measure what exists: available capacity, pipe sizes, slab-to-ceiling heights, routing of services. We write the brief, the client approves it.

02

Concept and load calculations

Heating and cooling loads to EN 12831, electrical balance, water demand. This is where the kW and m³/h you will request from utilities are fixed.

03

Schematic design

Equipment layout, plant room areas, main shafts and routes. Agreed with the architect before the façade and ceilings close.

04

Detailed design

Plans, schematics, details, specifications and bills of quantities. Clashes are resolved in the model — pipe and duct meet on screen, not on site.

05

Technical conditions and approvals

Applications to utility companies, fire section review, closing of comments. We keep a log of what was submitted and when.

06

Tender and suppliers

We issue a procurement sheet with technical parameters and compare offers on service and spare-part availability, not price alone.

07

Site supervision

Scheduled visits, hidden-works records, change tracking. An installation error is corrected while the ceiling is still open.

08

Commissioning and handover

Air and water balancing against design, interlock testing, as-built documentation and an operating manual for the facility team.